Yeah. I Gave In And Got A Power Drill.
Picked it up on the way back from my latest trip to Columbia Records.
Now I've got the authority to actually do things. There's a lot of things that need doing.
So going through everything I look at buying online is going to take a seriously long time.
https://www.jpost.com/breaking-news/article-738806
It almost goes without saying. The board, singular, between the cold water tank and all the pipework is going to need to be replaced. Which might actually involve a full-size circular saw.
As I've said those boards are around 1,500x900mm. The access hatch is around 700x500mm.
Honestly, the mind boggles. I'm starting to think they must've put the roof on afterwards.
Comments
Post a Comment